- Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
- [latex]11\frac{7}{8}\text{"}[/latex]
- Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
- [latex]15\text{"}[/latex]
- Calculate the pipe length:
- [latex]47\text{' }6\text{"}[/latex]
- Calculate the pipe length:
- [latex]88\text{'}[/latex]
- Calculate the grade in inches per foot:
- [latex]\frac{1}{8}\frac{\text{"}}{\text{ft.}}[/latex]
- Calculate the grade as a percentage:
- 0.95%
- Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
[latex]16\frac{1}{4}\text{"}[/latex]
Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
- [latex]26\frac{3}{4}\text{"}[/latex]
Calculate the length:
- 16.2 m
Calculate the length:
- [latex]199.5\text{'}[/latex]
Calculate the grade in inches per foot:
- [latex]\frac{1}{16}\frac{\text{"}}{\text{ft.}}[/latex]
Calculate the grade as a percentage:
- 0.54%
Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
[latex]4\frac{3}{4}\text{"}[/latex]
Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
[latex]22\frac{3}{4}\text{"}[/latex]
Calculate the pipe length:
[latex]100\text{'}[/latex]
Calculate the pipe length:
[latex]36\text{' }11\frac{3}{4}\text{"}[/latex]
Calculate the grade in inches per foot:
[latex]\frac{1}{8}\frac{\text{"}}{\text{ft.}}[/latex]
Calculate the grade as a percentage:
1%
Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
[latex]10\frac{3}{8}\text{"}[/latex]
Calculate the total fall to the nearest [latex]\frac{1}{8}[/latex] inch:
[latex]58\frac{1}{2}\text{"}[/latex]
Calculate the length:
[latex]144.23\text{'}[/latex]
Calculate the length:
[latex]360\text{'}[/latex]
Calculate the grade as a ratio:
1:50
Calculate the grade as a ratio:
1:300
Convert each measurement to engineer’s measurement (3 decimal places):
[latex]18.5\text{'}[/latex]
[latex]15.417\text{'}[/latex]
[latex]32.75\text{'}[/latex]
[latex]33.833\text{'}[/latex]
[latex]35.938\text{'}[/latex]
Convert each measurement to builder’s measure (nearest [latex]\frac{1}{8}\text{"}[/latex])”
[latex]84\text{' }3\frac{1}{4}\text{"}[/latex]
[latex]93\text{' }1\text{"}[/latex]
[latex]106\text{' }8\frac{1}{2}\text{"}[/latex]
[latex]123\text{' }5\frac{1}{4}\text{"}[/latex]
[latex]156\text{' }11\text{"}[/latex]
A house construction site has a benchmark of 100.00′, basement floor elevation of 94.20′, first floor elevation of 103.75′ and second floor elevation of 113.00′.
How far below the benchmark is the basement floor?
[latex]5.8\text{'}[/latex]
How far above the benchmark is the first floor?
[latex]3.75\text{'}[/latex]
What is the distance from the basement floor to the first floor?
[latex]9.55\text{'}[/latex]
What is the distance from the first floor to the second floor?
[latex]9.25\text{'}[/latex]
The low end of a sanitary building drain has an elevation of 91.55 feet. The grade is [latex]\frac{1}{8}[/latex] inch per foot.
What is the elevation of a fitting 10′ upstream of the low point?
[latex]91.65\text{'}[/latex]
What is the elevation of a fitting 25′ upstream of the low point?
[latex]91.81\text{'}[/latex]
Refer to Figure 27 to solve for the unknown values.
[latex]86.000\text{'}[/latex]
[latex]86.333\text{'}[/latex]
[latex]87.646\text{'}[/latex]
[latex]88.771\text{'}[/latex]
[latex]92.646\text{'}[/latex]
[latex]92.146\text{'}[/latex]